Forest Hills Connection | News and Life in Our DC Neighborhood

Covering Forest Hills, Van Ness, North Cleveland Park and Wakefield

  • About Us
    • About Forest Hills Connection
    • Contact Us
    • Subscribe to Our Newsletter
    • Donate
    • Advertise
    • Comments Policy
    • Submissions Policy
  • Classifieds
  • News
    • ANC 3F
    • Business
      • Business in Brief
    • Main Street
    • Neighborhood in the News
    • Parks and Streams
    • UDC
  • Style
    • Food
    • History
    • Meet the Neighbors
    • Services
    • Things To Do
  • Home Front
  • Backyard Nature
  • Kids
  • Local Attractions

27th Street bridge reopens after 3-month replacement project

October 21, 2015

Zahra Dorriz holds the ribbon while Paul Hoffman cuts it at Monday's ceremony. Dorriz was DDOT's project manager on the 27th Street bridge project; Hoffman, the program manager at DDOT. (DDOT photo)

Zahra Dorriz holds the ribbon while Paul Hoffman cuts it at Monday’s ceremony. Dorriz was DDOT’s project manager on the 27th Street bridge project; Hoffman, the program manager at DDOT. (DDOT photo)

Three months ago, the 27th Street bridge at Broad Branch Road closed for a major overhaul – it was torn down and replaced. The bridge reopened after a ribbon-cutting ceremony on Monday, October 19th.

The old bridge closed on Monday July 20th. The new bridge has an addition – a new sidewalk, which can be seen in the photo.

Share this post!

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • More
  • Print (Opens in new window) Print

Related


Discover more from Forest Hills Connection | News and Life in Our DC Neighborhood

Subscribe to get the latest posts sent to your email.

Filed Under: Getting Around, News

Comments

  1. JOHN says

    December 17, 2015 at 8:10 am

    I WOULD LIKE TO CONTACT THE CONTRACTOR THAT DID THIS WORK TO GET DETAILS ABOUT THE DESIGN AND CONSTRUCTION OF THE BRIDGE SYSTEM THAT WAS USED. THANK YOU FOR ANY INFORMATION YOU MIGHT HAVE.

    JOHN

    • David says

      February 16, 2016 at 8:00 pm

      This might be helpful:
      http://fortmyer.com/projects/27th-street-nw-bridge-replacement/

About Forest Hills Connection

  • Who we are
  • How to advertise
  • How to donate
  • How to submit an article
  • Our comments policy
  • Contact us

Connect With Us!

Follow Us on FacebookFollow Us on TwitterFollow Us on Instagram

Latest Comments

  • Paul on A Forest Hills intersection’s new design is part of a larger stormwater control project
  • David Cohen on The spring bird migration brings out the birdwatchers in Rock Creek Park
  • Miles-Kevin Baron on Two visions for the former Intelsat/Whittle campus: As an education and civic center, or tearing it down and rebuilding with housing
  • Mohammad on A Forest Hills intersection’s new design is part of a larger stormwater control project
  • Paul on A Forest Hills intersection’s new design is part of a larger stormwater control project

Archives

About Forest Hills Connection | FHC + VNMS | Who We Are | Contributors
Submissions Policy | Contact | Advertise | Donate |
© Forest Hills Connection | Site by: VanStudios
 

Loading Comments...