by Marlene Berlin The Soapstone sewer rehabilitation project has an air quality monitoring plan and permit that will allow DC Water’s contractor to proceed with the pipe relining phase of […]
Search Results for: soapstone
DC Water omits details of Soapstone sewer bypass pipe installation in public communications
by Marlene Berlin On Tuesday, October 25th, Tara Waterman emailed DC Water about what she described as “a pervasive acrid, chemical odor consist[ent] with vinyl chloride off-gassing” emanating from the […]
Soapstone sewer updates: Public outreach, air quality permit hearing and other dates to remember
Noise-producing stream work behind Park Connecticut and Park Van Ness. A partial street closure. A farmers market meet-and-greet. DC Water’s September 14th project update email had dates for all of […]
Soapstone sewer updates: A neighborhood working group is tackling issues including air pollution and noise
by Marlene Berlin A neighborhood working group has formed to work on issues that have come up as DC Water proceeds with its sewer rehabilitation project in the Soapstone Valley. […]
DC Water says Soapstone sewer project noise is within allowed limits. That’s no comfort to its neighbors.
The noise generated by pumps diverting Soapstone Creek from one of the sewer project sites has generated noise complaints from neighboring residents. FYI this is how it sounds from 7AM […]
Soapstone sewer project update: Stream restoration under way; noise complaints, and no sewer pipe work for at least 60 days
by Marlene Berlin The sewer rehabilitation project in the Soapstone Valley is also a stream restoration project, intended both to repair damage from years of stormwater erosion and to armor […]
ANC 3F July 19 agenda: A deputy mayor and a Soapstone update
And a quick note on our neighbors in ANC 3E. The Tenleytown/Friendship Heights advisory neighborhood commission’s July 20th meeting agenda includes updates on two redevelopment projects of local interest: Mazza […]
Local air quality expert and ANC 3F alarmed that Soapstone sewer project oversight won’t include an air quality permit
DC’s environmental agency will not require an air quality permit “at this time” for DC Water’s sewer pipe relining project in the Soapstone Valley. The reason, ANC 3F commissioners were […]
Soapstone Valley’s new temporary roads are already working hard
by Marlene Berlin The Soapstone Valley’s new temporary roads are being put through their paces already. Eventually, the roads will be used to haul in equipment for the sewer rehabilitation […]
In the Soapstone Valley, DC Water is building bridges
by Marlene Berlin The Soapstone Trail creek crossing closest to Broad Branch Road could be tough to navigate. This one looks easy. There is a new bridge – a substantial […]
- « Previous Page
- 1
- 2
- 3
- 4
- 5
- …
- 47
- Next Page »